آئندہ کی تعمیراتی سرگرمیوں

Sr. No Activity DIA (Inch) Length (KM) Commissioned On
1 Hattar – Abbottabad Line 16 62.50 Procurement of Material / Acquisition of Land and Preparation of Design Drawings in progress
2 Mian Channun – Hasilpur Line 12 90.00 As above
3 Hasilpur – Chistaian Mandi Line 8 35.00 As above
4 Lachi – Manjuwala Line 12 85.00 As above
5 Hangu Line 8 35.00 As above
6 Manjuwala – End Point Line 8 195.00 As above
Total 502.05  
Budgeted Cost (Million Rs) 4200.00

Updated: 24-06-2010